Red-brick London townhouses illustrating a multi-property compliance portfolio

How to Prepare a Multi-Property Compliance Quote for London Letting Agents

If you manage 12 flats, four HMOs and three commercial units, sending a separate unstructured enquiry for every gas, electrical or energy assessment makes comparisons difficult. A more effective approach is to build a single property schedule, then request a coordinated, itemised quotation from a provider who understands how inspection scopes differ.

This guide is written for letting agents, property managers and portfolio landlords arranging London property compliance services. It covers the information needed for a useful quote, not a promise that every check can happen during one visit.

1. Identify the property before naming the certificate

For each address, record whether the premises are a single private rental, converted flat, HMO, block common area or commercial unit. The property type affects the professional scope and applicable legal duties. A routine tenancy start in an apartment does not mean the same inspections are automatically required for a managed block or a warehouse.

  • Full address and postcode, preferably in separate spreadsheet columns.
  • Type of property and whether it is occupied.
  • Number of dwellings, shared areas or lettable rooms where relevant.
  • Main business contact and the person authorised to arrange access.
  • Known licence conditions, deadlines or existing inspection recommendations.

2. List the actual assessments required

Create a column for each of the services under consideration: gas safety (CP12), EICR, EPC, fire risk assessment, legionella assessment or other property-specific checks. Use “required”, “to be confirmed” or “not applicable” rather than assuming everything is needed for every building.

For example, a gas-free flat may have no landlord-supplied gas appliances to check. A fire-risk assessment covering communal areas of a block has a different scope from checking alarms inside a single let. Clarifying this before pricing prevents avoidable misunderstandings.

3. Record expiry dates and findings, not only certificates

A date-only spreadsheet is incomplete. It should also show whether a report was satisfactory, whether the inspector identified remedial action, and who is accountable for ensuring follow-up. The government’s electrical-safety guidance generally requires inspection and testing of residential electrical installations at least every five years, with earlier checks where a report directs. It also sets obligations for providing the report to tenants.

Gas safety follows a different interval: relevant landlord-supplied gas appliances and flues normally require an annual safety check by a Gas Safe registered engineer. A certificate schedule should not confuse these separate obligations.

4. Group work by geography and practical access

Location matters. A portfolio of properties in Camden, Hackney and Newham may be scheduled differently from three flats in the same building. The quotation should reflect the actual building, required disciplines and availability of competent specialists. Discuss key collection, parking or site access restrictions early, especially for occupied blocks and commercial premises.

Treat a request for one contact point as a coordination objective, not a guarantee of one engineer, one visit or a fixed turnaround. Different specialists can be necessary for electrical, gas, energy and fire work.

5. Ask for an itemised quote

When comparing quotations, ask which services, addresses and deliverables each figure covers. A price without a clear scope is hard to compare. A useful written quote should specify the included inspection, assumptions about access and occupancy, whether VAT applies, report format, booking lead time, and what would trigger an additional charge.

  • A per-address breakdown and a total for the proposed programme.
  • The report or certificate type expected for each discipline.
  • What happens if access fails or further inspection is needed.
  • Whether remedial work is excluded or priced separately.
  • Who issues each professional report and how it will be delivered.

6. Keep an evidence trail that your team can retrieve

For internal operations, maintain a register with address, discipline, last inspection, next review, responsible manager, outcome, report link and outstanding actions. Restrict access to tenant information. Keep an auditable distinction between an inspection report, a booking confirmation and a council licence: they are not interchangeable documents.

7. Recheck official requirements

Landlord obligations depend on the type of premises and the applicable regulations. GOV.UK’s landlord responsibilities provides a starting point. For legionella, the Health and Safety Executive explains why an annual test certificate is not generally required for ordinary domestic water systems. Council HMO and selective licensing schemes must be checked for each address.

Request one coordinated quotation

Primelinks Solutions Ltd coordinates enquiries for landlords, agents and property managers across Greater London. We can review a schedule of addresses, clarify the proposed services and discuss an itemised quotation, subject to availability and confirmed scope. We do not issue council licences and the specialist’s professional report remains the specialist’s responsibility.

Managing the certificates after the quote? Read how letting agents manage certificates across multiple properties.

Next steps: See our portfolio coordination process, view the letting-agent compliance calendar or request a quote. Call 07506 892739.

Scroll to Top